As a part of the bond issue completed in 2010 for the city of Newton, Newton High School received 27,000 sf of addition and remodeled spaces to the existing 1970 building. As a part of...

Spaght Multimedia Magnet is a pre-k through fifth-grade center for USD 259 in Wichita, KS. The 63,920 square foot school has along with classroom spaces, a music room, art room, computer lab and a...

 As part of a bond issue, Sterling High School received a 43,265 sf addition, and renovations to the existing 91,075 sf facility.  The new addition...

Augusta, Kansas successfully passed a $48M bond issue in May 2008, and part of these funds were allocated to the new construction of Lincoln Elementary School.  This three-...

After an extensive planning process and successful bond election, this facility was completed in the fall of 2008. The high school serves grades 9-12 which includes an auditorium that seats 750...

Sterling Grade School was part of a $20M bond effort that passed in 2008.  The bond also included major renovations and additions to the district's High School. The classrooms are...

Project-based learning has been the driving force behind this new 21st-century high school that engages students in a rigorous and relevant learning experience. It is an...

The addition to Cooper Early Childhood Center was the final project in a series at five different building sites, totaling $29.9 million for USD 373 Newton. This project significantly...

This is the balance of the information we can share at this time. Please return at a later date for more on Santa Fe Office Remodel.

Garfield was designed as a two section school with plans for future expansion to tree sections.

This is the balance of the information we can share at this time. Please return at a later date for more on Augusta Middle School.

Erie Elementary School Remodel is a part of a 24.8 million dollar bond and capital improvement campaign to build a new High School and convert the existing High School into a flourishing...

This is the balance of the information we can share at this time. Please return at a later date for more on Robinson Elementary.

This project was approximately $9M and consisted of five phases that spanned over two summers and a single school year.  The project included major renovations to the existing...

Part of a $14.25 million bond referendum, the new middle school was built on the existing middle school site.  A challenge to the design of this project was building the new structure while...

Slate Creek was one of twelve major construction projects funded by a $28.3 million bond referendum.  This facility is 53,400 sq. ft. on approximately ten acres and has a capacity of 450...

Santa Fe Middle School was part of a $28.3 million bond issue that addressed the facility issues at every attendance center in the district.  This project encompassed the complete...

 

Paola High School is located in Paola, Kansas, a growing community near the metropolitan Kansas City area.  The school provides 140,000 square feet of floor area and was built...

The new Allen, Enterprise and Linwood Elementary School facilities replaced the original elementary school buildings. All three were built on the former sites of the schools, the previous...

The 143,000 square-foot Coffeyville Community Elementary School, Coffeyville, Kansas, shares a gymnasium, media center and other facilities with the community. The school has generous corridors,...