Burlington Water Treatment Plant

in Government

PBA and Shetlar Griffith Shetlar worked in conjunction to design a new water treatment plant for the City of Burlington. Numerous 3-D computer models were developed during the design process. With the use of 3-D models many different perspectives can be easily viewed and studied. These models were instrumental in developing the exterior facade and selection of materials. PBA and the City of Burlington, collectively, were able to communicate ideas using these images to create a final design which was agreed upon by all involved. Copies of these images were used to show neighbors in the area how the building would look before it was built in their neighborhood.